Help With RV Solar Wiring Diagram

Help With RV Solar Wiring Diagram

Wiring Diagram: https://ibb.co/fC6Tv9

Hi all, looking for some assistance with a solar setup for an RV! My wiring diagram pictured above.

Questions:

1) Do I need any more fuses/breakers?

2) If I get a 50 amp mppt charger controller, I shouldn't run it and the 75 amp converter/charger at the same time right? From what I've read, the two chargers can't work together and configure voltage accurately (for float etc.). Or if I do, only use the two combined to get the batteries up to 80%. With 800ah battery bank the two combined will only be about 0.17C, but I'm worried about the voltages not being right for float charging.

3) The 2500w inverter is combined with a 75 amp charger/converter with an auto-transfer switch. Does this affect my wiring in any way? I feel like with the way it's set up, it will want to output power to the solar charger? I think this is wrong, but I just wanted to check.

4) Am I missing anything else?

Notes:

  • Wiring is a bit oversized because I want to be able to pull close to 250a for short periods.

  • Panels each do about 27v @ 6.5 amp at NOCT, the 45.5v @ 12v was an equivalent I listed to put it in terms of the battery bank.

Thank you!

MPPT: https://www.amazon.com/gp/product/B073ZJ43L1/ref=oh_aui_detailpage_o06_s00?ie=UTF8&th=1

Batteries: https://www.amazon.com/gp/product/B00S1RT58C/ref=oh_aui_detailpage_o05_s00?ie=UTF8&psc=1

Fuse Block: https://www.amazon.com/gp/product/B001P6FTHC/ref=oh_aui_detailpage_o03_s00?ie=UTF8&psc=1

100 amp fuse: https://www.amazon.com/gp/product/B01N4K9MXD/ref=oh_aui_detailpage_o03_s00?ie=UTF8&psc=1

2500w inverter/charger: https://www.amazon.com/gp/product/B076Y9J512/ref=oh_aui_detailpage_o06_s01?ie=UTF8&psc=1

Solar splitter: https://www.amazon.com/gp/product/B07B4WWZHK/ref=oh_aui_detailpage_o09_s00?ie=UTF8&psc=1

submitted by /u/JCMiller23
[visit reddit] [comments] https://ift.tt/2P1bQI4